Monday, 6 April 2020
Thursday, 27 February 2020
Unit Weight of Material used in Construction
*Unit Weight of Materials Used at Construction Site:*
1- Water= 1000 Kg/ m3
2- Bricks (broken)= 1420 Kg/ m3
3- Bricks(common)= 1600 Kg/ m3
4- Cement(ordinary)= 1440 Kg/ m3
5- Cement (rapid hardening)= 1250 Kg/ m3
6-Cement Mortar= 2000 Kg/ m3
7- Cement Concrete (Plain)= 2400 Kg/ m3
8- Cement Concrete (Reinforced)= 2500 Kg/ m3
9- Glass= 2500 Kg/ m3
10- Lime Concrete= 1900 Kg/ m3
11- Cement Plaster= 2000 Kg/ m3
12- Lime Plaster= 1700 Kg/ m3
13 Stones (Ballast)= 1720 Kg/ m3
14- Stones (Aggregates)= 1750 Kg/ m3
15- Stones (Basalt)= 2850 Kg/ m3
16- Stones (Granite)= 2450 Kg/ m3
17- Stones (Marble)= 2650 Kg/ m3
18- Timber (Oak, Sal)= 510 Kg/ m3
19- Timber (Mango)= 650 Kg/ m3
20- Timber (Teak)= 625 Kg/ m3
21- Coal 600= Kg/ m3
22- Plastics= 1250 Kg/ m3
23- Oils= 800 Kg/ m3
24- Ashes= 650 Kg/ m3
25- Clinker= 750 Kg/ m3
26- Rubber= 1300 Kg/ m3
27- Slag= 1500 Kg/ m3
28- Clay Soil= 1900 Kg/ m3
29- Sand (dry)= 1540 to 1600 Kg/ m3
30- Sand (wet)= 11760 to 2000 Kg/ m3
31- Steel= 7850 Kg/ m3
32- Chalk= 2100 Kg/ m3
33- Bitumen= 1040 Kg/ m3
Tuesday, 11 February 2020
About Plumbing Traps
Traps –
A Trap is a device which is used to prevent sewer gases from entering
the building.
Common gases that are produced in a
sewage system.
1-Methane
2- Hydrogen sulphide
3-
Nitrogen Sulphide
4- Carbon monoxide
Depending upon the shape are
classified as:
1-P Trap- This trap is used with Indian water
closet, is used for outlet through the wall.
2-Q Trap-This trap is used in toilet under water closet.
3-S Trap - Similar to P Trap and is used for fixing water closet in
toilets (through the floor)
4-Nahni/Floor Trap- This trap is
provided in the floor to collect waste water from washbasin, shower, sink, bathroom.
5-Gully trap- These traps are constructed outside
the building to carry waste water discharge from wash basin, sinks, bathrooms
etc and connected to the nearest building drain/sewer so that foul gases from
sewer do not come to the house.
6-Intercepting trap- This
is provided at the last main hole.
7-Bottle Trap-
This Trap is used below
washbasin and sinks to prevent entry of foul gases.
Monday, 10 February 2020
Parasite: पढ़िए उस फिल्म की पूरी कहानी जिसने ऑस्कर में धमाल मचा दिया
पैरासाइट' पहली एशियन फिल्म है जिसे ऑस्कर में बेस्ट फिल्म अवॉर्ड से नवाजा गया है। इस फिल्म का प्रीमियर 2019 के कान फिल्म फेस्टिवल में भी हुआ था। Parasite को साउथ कोरिया के सिनेमाई इतिहास में सबसे बेहतरीन फिल्मों में गिना जा रहा है। इस फिल्म ने साउथ कोरिया में 167.6 मिलियन डॉलर का कारोबार किया है।
साउथ कोरियन फिल्म 'पैरासाइट' ने धमाल मचा दिया है। इस फिल्म को 'ऑस्कर 2020' में 'बेस्ट फिल्म' साहित 4 अवॉर्ड्स मिले हैं। Bong Joon-ho के डायरेक्शन में बनी इस फिल्म को 'बेस्ट ओरिजनल स्क्रीनप्ले', 'बेस्ट डायरेक्टर' और 'बेस्ट इंटरनेशनल फीचर' कैटिगरी में भी ऑस्कर मिला है। 'पैरासाइट' पहली एशियन फिल्म है जिसे इस प्रतिष्ठित अवॉर्ड से नवाजा गया है। इस फिल्म का प्रीमियर 2019 के कान फिल्म फेस्टिवल में भी हुआ था। Parasite को साउथ कोरिया के सिनेमाई इतिहास में सबसे बेहतरीन फिल्मों में गिना जा रहा है। इस फिल्म ने साउथ कोरिया में 167.6 मिलियन डॉलर का कारोबार किया है।
अब तक विदेशी फिल्में नहीं रहींं ज्यादा सफल
पैरासाइट' में Song Kang-ho, Lee Sun-kyun, Cho Yeo-jeong, Choi Woo-shik, और Park So-dam मुख्य भूमिका निभा रहे हैं। दिलचस्प बात यह है कि इससे पहले विदेशी भाषा वाली फिल्में ऑस्कर में बहुत ज्यादा सफल नहीं रही हैं। इससे पहले 'डिवोर्स इटालियन स्टाइल', 'अ मैन एंड ए वुमन' और 'टॉक टू हर' जैसी फिल्में भी ऑस्कर अपने नाम कर चुकी हैं।
गरीबी, अमीरी और अधिक की चाहत वाली कहानी
पैरासाइट' की कहानी कोरिया में रहने वाले एक गरीब और एक उच्च वर्गीय परिवार की है। पैरासाइट एक ब्लैक कॉमेडी है, जिसमें सोशल स्टेट्स के साथ ही अधिक की चाहत और विलासपूर्ण जीवन के बीच के अंतर को खूबसूरती से दिखाया गया है। पढ़िए फिल्म की पूरी कहानी-
किम परिवार एक छोटे से सेमी-बेसमेंट अपार्टमेंट में रहता है। परिवार में पिता Ki-taek हैं। मां Chung-sook, बेटी Ki-jeong और बेटा Ki-woo. परिवार के सभी चार लोग टेम्पररी जॉब्स करते हैं। आमदनी कम है। एक दिन डिनर करते वक्त उनके घर Min-hyuk आता हैं। वह की-वू का अच्छा दोस्त है। Min-hyuk विदेश पढ़ने जाने की तैयारी कर रहा है। डिनर के बाद की-वू और मिन ड्रिंक के लिए बाहर जाते हैं। मिन यहां की-वू से कहता है कि उसे एक पड़ोस के अमीर पार्क फैमिली के यहां नौकरी करनी चाहिए। उन्हें बेटी को पढ़ाने के लिए ट्यूटर की जरूरत है।
मिन कहता है कि वह यूनिवर्सिटी के किसी और दोस्त पर भरोसा नहीं कर सकता और इसलिए यह जिम्मेदारी की-वू को सौंपना चाहता है। पार्क फैमिली अपनी बेटी Da-hye के लिए किसी यूनिवर्सिटी स्टूडेंट पर ही भरोसा करेगी। कहानी में दिलचस्प मोड़ आता है और किम परिवार के सभी चार सदस्य धीरे-धीरे पार्क फैमिली में नौकरी के लिए जुगाड़ निकालने लगते हैं। ये चारों खुद को हाइली क्वालिफाइड बताते हैं, जो कि झूठ है। की-वू ट्यूटर बन जाता है। वह Da-hye से रोमांस भी करने लगता है।
की-वू की बहन Ki-jeong खुद को आर्ट थेरेपिस्ट बताकर नौकरी पा लेती है। वह पार्क फैमिली के बेटे Da-song की थेरेपिस्ट बन जाती है, जो थोड़ा अजीब और अस्थिर है। Ki-jeong मिस्टर पार्क की कार की पिछली सीट में अपना अंडरवियर रख देती है। Ki-jeong पार्क से यह कहकर ड्राइवर को निकलवा देती है कि वह कार की पिछली सीट पर किसी लड़की के साथ शरीरिक संबंध बना रहा था। की-वू के पिता Ki-taek घर में ड्राइवर बनकर आ जाते हैं। मां Chung-sook हाउसकीपर के तौर पर पार्क फैमिली को जॉइन करती है। इस तरह पूरा किम परिवार, मिस्टर पार्क के यहां नौकरी करने लगता है।
इस बीच पार्क फैमिली एक कैम्पिंग ट्रिप प्लान करती है और छुट्टियों पर चली जाती है। किम परिवार अब लग्जरी सुविधाओं से सजे बड़े से घर में अकेला है। पार्क फैमिली के जाते ही घर की पुरानी हाउसकीपर Moon-gwang सामने आ जाती है। वह खुलासा करती है कि घर में एक छिपा हुआ रास्ता है, जो घर के नीचे बने एक बंकर में पहुंचता जाता है। मून किम के परिवार को बताती है कि वह और उसका पति 4 साल तक उस बेसमेंट वाले घर में छिपकर रहे हैं, क्योंकि कर्जदार उन्हें परेशान कर रहे थे
इस बीच मून को किम परिवार की सच्चाई का पता चलता है। वह धमकी देती है कि पार्क फैमिली को वह सारी सच्चाई बता देगी कि चारों का आपस में रिश्ता है। मून शर्त रखती है कि यदि किम परिवार उसके रहस्य का खुलासा नहीं करते हैं तो वह चुप रहेगी। दोनों परिवारों के बीच झगड़ा होने लगता है
इस बीच मौसम खराब होने की वजह से किम परिवार जल्द ही छुट्टियों से लौट आता है। लेकिन इस बीच मून और उसके पति की किम परिवार से लड़ाई हो रही है। किम परिवार के चारों सदस्य दोनों पति-पत्नी को घायल कर देते हैं और बांधकर बेसमेंट में बंद कर आते हैं। मिस्टर पार्क और उनकी फैमिली घर लौटती है। Chung-sook खाना पकाती है और डिनर सर्व करती है। इस दौरान वह बताते हैं कि उनके बेटे Da-song ने कुछ साल पहले एक भूत देखा था, जिसके बाद से वह अजीब बर्ताव करने लगा है।।
शहर में आंधी और बाढ़ आती है। पूरा घर पानी से भर जाता है। पार्क घर की हालत के लिए सबको फटकार लगाते हैं। स्थिति नियंत्रण में आने के बाद मिस्टर पार्क अपने बेटे के जन्मदिन पर पार्टी की घोषणा करते हैं। किम परिवार के चारों लोग भी पार्टी में मौजूद हैं। इस दौरान की-वू घर के नीचे बने बंकर में जाता है। लेकिन देखता है कि मून की मौत हो चुकी है। मून का पति Geun-sae की-वू पर हमला करता है और वहां से भाग निकलता है।
Geun-sae अपनी पत्नी की मौत का बदला लेना चाहता है और रसाई में रखे चाकू से Ki-jeong के सीने में सब के सामने खंजर घोंप देता है। अफरा-तफरी मच जाती है। इस माहौल में Ki-taek भी मिस्टर पार्क से गुस्सा है। वह लगातार शिकायतों से परेशान है और मिस्टर पार्क का खून कर देता है।
अब कुछ हफ्तों बाद की कहानी दिखाई जाती है। की-वू अब ठीक है। वह मून के पति के हमले की वजह से कोमा में चला गया था। की-वू और उसकी मां पर फ्रॉड का आरोप लगा है। जबकि उसकी बहन Ki-jeong घायल होने और चोट लगने की वजह से मर गई है। पिता Ki-taek पर मिस्टर पार्क के खून का इल्जाम है और वह फरार है।
मिस्टर पार्क का घर एक जर्मन परिवार को बेच दिया गया है। की-वू को उसके फरार पिता का संदेश मिलता है। Ki-taek ने मेसेज में लिखा है कि वह अभी भी उसी बंकर में छिपकर रह रहा है। की-वू अपने पिता को चिट्ठी लिखता है कि एक दिन वह खूब पैसे कमाएगा और यह आलीशान बंगला खरीदेगा। वह वादा करता है कि एक दिन परिवार को मिलाकर रहेगा।
Thursday, 6 February 2020
Electrical Wall Conduiting.
The wires are installed in 4
steps.
Step 1: Laying the electrical conduits in the
slab
Step 2: Laying the electrical conduits in the
wall
Step 3: Installation of Switch Boards Back
Boxes
Step 4: Installation of Distribution Boards
Let us look at the step-by-step
installation procedure of a concealed conduit electrical wiring system.
Step-1: Laying of Electrical
Conduits in Slab
The slab conduits for house wiring should be 2 mm thick
and 25 mm in size for PVC conduits. Lay the slab conduits between the top and
bottom reinforcement.
Use only deep junction boxes in
slabs. Properly bind the PVC conduits using the binding wire.
It would be ideal to follow the colour
coding for conduits for electrical wires and data such as LAN and telephone
wire. Use grey PVC pipes for data, black PVC pipes for electrical wires and PVC
solvent for joining the accessories
Check the wall drops carefully
and determine the concrete thickness.
Check the conducting as per the
service drawings and see where the switchboards are located and how many points
need to be installed at each location
Take special precautions while
concreting the slab
Replace all the broken pipes
Ensure that all the joints are
watertight
Once the slab and beam are
de-shuttered, pass the GI wiring immediately. Document any choke up or
alternate route for future references
Provide all the necessary sleeve
in beams, columns prior to slab casting as per electrical &
air-conditioning
Provide the pull boxes at
suitable locations
Don’t cluster the pull and
junction boxes at one place. Arrange them so that they can’t be seen easily
from heavy movement areas as per the electrical drawings
Step-2: Laying of Electrical
Conduits in Wall
Carry out the concealed conduit
work after the construction of masonry walls but before the plastering work
starts
Once the curing of brickwork is
completed, carry out the chasing work. Ideally, maintain a gap of 7 days
between the two activities
Do the wall chasing with wall
cutters only as this would avoid damage to the walls
Fix the electrical conduits with
the approved clips to ensure proper routing and wiring
Once the conduits, boxes and
accessories are fixed, fill the chiselled surface with cement mortar and chick
mesh wrapped around the conduits
Start the wall conducting
activity with level marking on the wall, keeping the height above FFL (Finished
floor level) in mind
Limit the width of chasing as per
the number of conduits
The depth of chasing should be at
least 10 mm from the masonry wall to have the conduit recess
Make sure that all the horizontal
conduit runs are straight at the box level. The light point conduit should run
straight vertically to the switch box. Make sure no wall conduit is taken
haphazardly
Don’t use any elbows or bends.
Use a spring to bend if you want to change the direction of the pipe.
Don’t run power conduits near any
communication line
Run the conduits above the false
ceiling with proper support. Don’t rest them on the false ceiling in any case.
Seal the vertical runs with open ends at the top if you have false ceiling work
Step-3: Installation of Switch
Boards Back Boxes
Fix the concealed switchboard
properly in level based on the architect’s design, for example, distance and
height from the finished floor level (FFL)
Ensure that the gap between the
concealed switchboards is uniform. Maintain the same uniformity across all the
installations.
The switchboards must be readymade
modular type metal boxes of the approved make. Fix the concealed box 3 mm below
the plastered surface.
Finish the box fixing before the
plastering work while doing the wall conduiting. Fill the boxes with thermocol
while the plastering work is being done.
Step-4: Installation of
Distribution Boards
Conceal the distribution board
before the plasterwork
Fix the DB box in a proper line
and level the recess provided in the brickwork
Ready the box as per the design
such as fixing the number of conduits entering the distribution box
Place the PVC pipes from the
given entry holes only
Make sure that you go through all
these steps in an orderly manner for the successful installation of the
concealed electrical wiring system. Our experts at D&F Liquidators, Inc.
can help you with the successful installation of concealed electric wiring at
your home. Do contact us to know more details about the same.
AHU
An Air Handling Unit (AHU)
is used to
re-condition and circulate air as part of a heating, ventilating and
air-conditioning system.
An air handler, or air handling unit (often
abbreviated to AHU), is a device used to regulate and circulate air as part of
a heating, ventilating, and air-conditioning (HVAC) system. ... Sometimes AHUs
discharge (supply) and admit (return) air directly to and from the space served
without ductwork.
A packaged rooftop unit, or RTU,
is a type of HVAC system that contains all the components needed to provide
conditioned air in one concise unit. Packaged rooftop units are commonly found
in light and large commercial applications. They are very popular with retail
and industrial properties.
An AHU capacity of an air conditioning system
is expressed in BTU's or Tons. 1 Ton = 12,000 BTU's/hours of cooling capacity.
As far as my knowledge, an AHU capacity in a cooling coil system can be
identified only by decoding the air conditioner number.
A chiller plant is a centralized system that
cools the air for a building or for a collection of buildings and provides the
air-conditioning portion of HVAC systems. According to the federal government's
Energy Star website, over 35 percent of buildings larger than 100,000 square
feet contain chiller plants.
Unit of airflow employed in
air-conditioning. A typical air conditioner, for example, produces about 400
CFM for each ton of its cooling capacity. One CFM equals about 28.31 litters
per minute.
Cubic feet per min- CFM
The airflow is measured in cubic feet per
minute (CFM). 350 to 400 CFM per ton of cooling is required for proper air
conditioning system operation. For example, if you are checking a 3-ton system,
the air flow required is between 1050 and 1200 CFM. Usually, chillers used to
carry R-22 gas in the refrigerant circuit.
There are three different types of
chillers:(1) air, (2) water, and (3) evaporative condensed chiller. There
are four subcategories in each of the above categories for industrial chillers:
(1) reciprocating, (2) centrifugal, (3) screw driven (4) and absorption
chillers.
How many CFM do I need for 1000 square
feet?
Heat and energy recovery
ventilators
Total area of home (square
feet) Continuous
ventilation rate
1,000 square feet 50
CFM
2,000 square feet 100 CFM
3,000 square feet 150
CFM
Wednesday, 29 January 2020
Important Interview Tips to Remember
Here are some important interview tips you should know before appearing for an interview in your dream company.
1) Insights about the company
The more you know, the better it is. Get insights about the company you are scheduled to have an interview at. Get insights about their previous projects, achievements, etc. This shall pave your way for a confident interview & also give you an edge over the rest of the candidates.
2) Be professional, look professional
One of the most long-lasting impression is the first impression. Indeed half the battle is won when you look professional along with well-versed skillset. While appearing for an interview, it’s highly recommended to look clean, sharp & professionally dressed. This not only brightens your chances to get selected but also leaves a lasting impression on the interviewer.
3) In-depth knowledge about your field
Corporate interviews have become quite competitive & apart from basic HR questions, these days many interviewers tend to go technical. Many questions related to the field of expertise are asked & relevantly precise answers are expected from the candidate. Unless & until you don’t acquire in-depth knowledge about your field, it’s quite unlikely that you shall get through your interview.
4) Know what shall you bring to the firm
It’s important & one of the most frequently asked questions during an interview. You should know your strengths & how they shall fit well within the framework of the company. What are the things you shall bring in which can strengthen the core values of the company, should be a must know. This not only makes you look well aware of your strengths but also provides an insight into the value you bring in to the company.
5) Be Confident
Confidence in any interview is the key. Lack of confidence can prove disastrous even if you know everything related to your field. Make sure your confidence level is high while you appear for your interview, practice before appearing. A confident candidate is always a preference as he/she showcases traits of being a leader.
6) Don’t be vague
Usually, interviewers create an opinion about the candidate within minutes of starting the interview. A simple question is expected to have a precise answer rather than vague, irrelevant answers. While you answer questions in an interview, make sure your answers are precise & to the point. Don’t give vague answers. This shall jeopardize your chances of being shortlisted.
The above-mentioned interview tips broadly defines the parameters which can help in cracking that all-important interview. However, every interviewer is different, hence sometimes you need to be prompt enough to answer any unexpected question which might come your way during an interview.
Interviews can prove to be tricky unless you don’t approach them the right way. Make sure your preparations are up to the mark & you don’t treat any of your interviews lightly. After all one interview can give you the job you were waiting for & the same interview can pull you miles away from it.
Subscribe to:
Posts (Atom)
Pushpa 2 Movie Review and release LIVE Updates: Will Allu Arjun and Sukumar's reunion break all records for an Indian film?
'Pushpa 2: The Rule' aka 'Pushpa 2': Will Allu Arjun and Sukumar's reunion break all records for an Indian film? Pushpa ...
![](https://static.toiimg.com/thumb/msid-115975285,imgsize-64302,width-400,resizemode-4/115975285.jpg)
-
इतिहास टिहरी गढ़वाल उत्तराखंड राज्य के बाहरी हिमालयी दक्षिणी ढलान पर पड़ने वाला एक पवित्र पहाड़ी जिला है । कहा जाता है की इस ब्रह्माण्ड की रचना...
-
The wires are installed in 4 steps. Step 1: Laying the electrical conduits in the slab Step 2: Laying the electrical conduits in the ...
-
Bermuda Triangle: आसान भाषा में समझिए क्या है बरमूडा ट्रायंगल की हिस्ट्री और मिस्ट्री Bermuda Triangle: हैरत की बात ये है कि पिछले 100 सालो...